Anchored in Strength. Driven by Excellence. +966 59 818 9191 info@ertkaz.com.sa

Overview

Reinforced-concrete bridges, interchanges and grade separations built with heavy formwork, falsework and precise heavy-lifting plans.

ERTKAZ executes the civil scope of interchanges and grade separations — piers, abutments, pier caps and deck structures — supported by engineered falsework, controlled concrete pours and detailed lifting methodologies.

Engineering & formwork support

  • Shop Drawings & BIM
  • Comprehensive Rebar Detailing
  • Custom Formwork Design
  • Clash Detection
Engineering & BIM

How We Deliver

A controlled path from design to durable concrete

Model & Detail

BIM models, shop drawings and rebar detailing developed from the design intent.

Coordinate & Check

Clash detection, constructability and compliance reviews resolve issues early.

Optimise

Value engineering and material optimisation refine cost and methodology.

Execute & Assure

Engineered formwork, controlled pours and QA/QC deliver the built result.

Related Projects

Project evidence

Khurais Interchange with 2nd Ring Road
Bridge & Interchange

Khurais Interchange with 2nd Ring Road

Scope Value: SAR 514 MillionArea: 149,000 m²Timeline: 2014–2016

Ready to discuss your project?

Request a quotation, prequalification documents or a capability statement.